Hot Water Tank Permit Application

    A permit is required to replace your hot water tank.

    A Hot Water Tank Permit will be issued automatically after this online application to remove and replace a hot water tank if you meet these conditions:
  • The location of the tank is not changing
  • The replacement tank is similar, has the same size capacity as to the existing tank.
  • The tank is in an individual unit (i.e. not a tank that services an entire strata building).
  • The replacement tank uses the same type of fuel as the original tank (i.e. you are not changing from electric to gas or on-demand).

    You can also use this online application if the location of the hot water tank, size or power source are changing, however the permit is not automatically issued. A Building Official will review the application before the permit can be issued. View the current review processing times.

    You don’t need a Hot Water Tank Replacement Permit:
  • For maintenance, repairs or minor component replacements on an existing tank.
  • If the work is already included in a permit (e.g. flood restoration or other construction permits).

    Do NOT complete this application in the following cases:
  • Work done to tanks in a commercial property - this requires a Plumbing permit.
  • Work done to a building/strata/common property tank that serves an entire building - this requires a Plumbing permit.
  • A tank installation in a new building - this is included in the Building Permit.

    Fees:
  • $109.64 per application. (Includes one inspection.)
  • Any deficiencies or re-inspection are charged at an additional $73.09 per re-inspection.
  • Administrative application processing fees do not apply to Hot Water Tank Replacement permits.

  • Click "continue" and log into MyWhistler or create an account to begin your application.


Note: Your application will save automatically during your session when you close your browser or sign out of your profile. View "my drafts" in your profile to resume your application.

Please complete and submit your application promptly to avoid starting your application over. Applications in draft status will not be reviewed until the application is “submitted”.